Projects

Perut 2 Underground Sub-Division

underground, underground installation, primary underground, conduit, high voltage cable, excavation

BWR successfully installed over 1500m of conduit and cable for Perut Place 2 sub-division. 

Dokis to Golden Valley

Live line pole change 44kv

BWR successfully and safely repaired over 60 structures damaged by wood peckers. This work was completed using live line methods during this off road road project spread over 44km

TL267 NL

Steel tower erection with liebherr crane

BWR was sub-contracted to provide supervision and labour for the construction of self supporting structures . TL267 was located in the central interior of New Foundland.

Industry Links

image7
image8
image9